Extension & External Groundworks
Bath
About This Project
The customer wanted the old extension removed and an extended open plan room to replace it, level to the outside. This required extensive digging and new structural steelwork. The project included an outside patio, ground water tank, new natural stone walling and oak pergola installation. A comprehensive transformation of the property's rear living space and garden.
The Build Process
Existing Extension Before Demolition
Demolition
Demolition
Demolition
Foundation Construction
Foundation
Foundation
Foundation
Steelwork
Steelwork
Internal Works Progressing
Rain Water Harvesting Tank
Tank Installation
Tank Installation
Tank Installation
External Groundworks
Stone Walling
Door Installation
Floor Installation
Flat Roof and Integrated Gutter
Roof Light
Level Access to Outside
Outdoor Lighting
Patio
Doors Complete
Completed Outdoor Living Space
Pergola Installed
Start Your Project
Inspired by this project? Get in touch to discuss how we can help with your build.
Get in Touch 07770 930623 07747 695262Project Details
- Project Type
- Extension
- Location
- Bath